"/>
Techno Press
Techno Press

Geomechanics and Engineering
  Volume 29, Number 4, May25 2022 , pages 391-405
DOI: https://doi.org/10.12989/gae.2022.29.4.391
 


Combined bi-borehole technology for grouting and blocking of flowing water in karst conduits: Numerical investigation and engineering application
Dongdong Pan, Yichi Zhang, Zhenhao Xu, Haiyan Li and Zhaofeng Li

 
Abstract
    A newly proposed grouting simulation method, the sequential diffusion solidification method was introduced into the numerical simulation of combined bi-borehole grouting. The traditional, critical and difficult numerical problem for the temporal and spatial variation simulation of the slurry is solved. Thus, numerical simulation of grouting and blocking of flowing water in karst conduits is realized and the mechanism understanding of the combined bi-borehole technology is promoted. The sensitivity analysis of the influence factors of combined bi-borehole grouting was investigated. Through orthogonal experiment, the influences of proximal and distal slurry properties, the initial flow velocity of the conduit and the proximal and distal slurry injection rate on the blocking efficiency are compared. The velocity variation, pressure variation and slurry deposition phenomenon were monitored, and the flow field characteristics and slurry outflow behavior were analyzed. The interaction mechanism between the proximal and distal slurries in the combined bi-borehole grouting is revealed. The results show that, under the orthogonal experiment conditions, the slurry injection rate has the greatest impact on blocking. With a constant slurry injection rate, the blocking efficiency can be increased by more than 30% when using slurry with weak time-dependent viscosity behavior in the distal borehole and slurry with strong time-dependent viscosity behavior in the proximal borehole respectively. According to the results of numerical simulation, the grouting scheme of "intercept the flow from the proximal borehole by quick-setting slurry, and grout cement slurry from the distal borehole" is put forward and successfully applied to the water inflow treatment project of China Resources Cement (Pingnan) Limestone Mine.
 
Key Words
    blocking mechanism; combined bi-borehole grouting; flowing water grouting; orthogonal experiment
 
Address
Dongdong Pan,Haiyan Li and Zhaofeng Li: Geotechnical and Structural Engineering Research Center, Shandong University,
Jinan, Shandong 250-061, China;
School of Civil Engineering, Shandong University, Jinan, Shandong 250-061, China
Yichi Zhang and Zhenhao Xu: Geotechnical and Structural Engineering Research Center, Shandong University,
Jinan, Shandong 250-061, China;
School of Qilu Transportation, Shandong University, Jinan, Shandong 250-061, China
 

Techno-Press: Publishers of international journals and conference proceedings.       Copyright © 2026 Techno Press
P.O. Box 33, Yuseong, Daejeon 305-600 Korea, Tel: +82-42-828-7996, Fax : +82-42-828-7997, Email: admin@techno-press.com