Buy article PDF
Instant access to
the full article PDF
for the next 48 hrs
US$ 35
Geomechanics and Engineering Volume 13, Number 4, October 2017 , pages 671-683 DOI: https://doi.org/10.12989/gae.2017.13.4.671 |
|
|
Combination of engineering geological data and numerical modeling results to classify the tunnel route based on the groundwater seepage |
||
A. Aalianvari
|
||
Abstract | ||
Groundwater control is a significant issue in most underground construction. An estimate of the inflow rate is required to size the pumping system, and treatment plant facilities for construction planning and cost assessment. An estimate of the excavation-induced drawdown of the initial groundwater level is required to evaluate potential environmental impacts. Analytical and empirical methods used in current engineering practice do not adequately account for the effect of the jointed-rock-mass anisotropy and heterogeneity. The impact of geo-structural anisotropy of fractured rocks on tunnel inflows is addressed and the limitations of analytical solutions assuming isotropic hydraulic conductivity are discussed. In this paper the unexcavated Zagros tunnel route has been classified from groundwater flow point of view based on the combination of observed water inflow and numerical modeling results. Results show that, in this hard rock tunnel, flow usually concentrates in some areas, and much of the tunnel is dry. So the remaining unexcavated Zagros tunnel route has been categorized into three categories including high Risk, moderately risk and low risk. Results show that around 60 m of tunnel (3%) length can conduit the large amount of water into tunnel and categorized into high risk zone and about 45% of tunnel route has moderately risk. The reason is that, in this tunnel, most of the water flows in rock fractures and fractures typically occur in a clustered pattern rather than in a regular or random pattern. | ||
Key Words | ||
tunnel; seepage hazard; classification; universal distinct element code | ||
Address | ||
A. Aalianvari: Mining Engineering Department, Faculty of Engineering, University of Kashan, Kashan, Iran | ||